Replacement of the Spitallamm dam

Replacement
of the Spitallamm dam

Large dams are not built very often in Switzerland anymore – the Spitallamm replacement dam built on Lake Grimsel in the Bernese Oberland is one of the few of its kind. From 2019 to 2025, Kraftwerke Oberhasli AG will replace the existing dam with a new dam. The old dam wall is in need of renovation, but it will be preserved and subsequently flooded. The construction of the old dam around 90 years ago was considered a spectacular feat – this is also the case this time around with the construction of the new dam wall. By replacing the Spitallamm dam with a new structure, KWO is making sure that the water from Lake Grimsel can be used in the long term without placing any restrictions on the production of electricity.

This page contains basic information about the construction site in English. All current content can be found on the website version in German.

Play Video
Construction site tour

A construction site with the dimensions of the Spitallamm dam wall is not a sight you see every day. We are therefore inviting you to take a close-up look at the construction.

kwo-anschiessen-grimsel-staumauer-spitallamm-eroeffnung-baustelle-2019
Start of the construction of the Spitallamm replacement dam

The blasting of a demolition charge marked the official start of the construction work for the new Spitallamm replacement dam at Lake Grimsel on 20 June 2019.

Project page

A concise summary of the important information on the Spitallamm major project

ralf-grand-chefbauleiter-kwo-ersatz-staumauer-spitallamm
Conclusion building season 2020

In a short interview, Ralf Grand, the chief construction manager of the KWO, looks back on the second successful construction season on the Grimsel.

Key figures for the project

Type double curvature dam

Costs approx. CHF 125 million

Construction time 2019-2025
Start of construction June 2019

Height 113 metres
Crest length 212 metres

Major construction site at 1,900 metres above sea level

Media Release 22. März 2019

KWO to build a replacement dam on Lake Grimsel

The start of June 2019 will see construction machinery fire up their engines at Lake Grimsel in the Bernese Oberland, as the Spitallamm dam – one of two dams on Lake Grimsel – is set to be rebuilt. The Board of Directors of Kraftwerke Oberhasli AG (KWO) made the decision to build the dam at today’s meeting.

Contact

Thomas Huber
Head of Communications

You can contact us on
+41 33 982 20 60

You can e-mail us at
thomas.huber@kwo.ch

Kraftwerke Oberhasli AG
Grimselstrasse 19
3862 Innertkirchen