Compensation measures for Innertkirchen 1 Power Plant

Project Contents

  • Construction of a new, 10km long parallel tunnel Handeck - Kapf (by Innertkirchen)
  • Conversion of  Pelton machine components in the Innertkirchen 1 plant.

Compensation Measures

  • Landscape maintenance Steinalp
  • Water management concept
  • System analysis of Lake Brienz